Projects

The CAP seeks to support a suite of projects across the San Joaquin Valley that meet the collective needs of all of the CAP caucuses. The projects below have been supported by the CAP through its consensus process following the review by representatives of all caucuses. Project Proponents of the projects below may request letters of support or advocacy for resources for projects from the CAP.

The CAP members and other interested parties are encouraged to submit additional projects for consideration, including new proposals or updates to previously submitted projects. Submissions should describe the proposed project, its anticipated benefits, alignment with the CAP’s Desired Outcomes, and potential for implementation. Additional projects will be reviewed by staff and may be incorporated into future project prioritization efforts and recommendations for support by the CAP. To submit a project to the CAP for consideration of support, please use this form: https://forms.gle/eFnL9yTc7iykCnGp8

 

Description: Consolidaiton of the Fuller Acres Water Company and Athal Mutual Water Company with Lamont Public Utilities District to provide safe drinking water to communities facing contamination from 123-TCP.

Sponsor / Proponent: Self-Help Enterprises

Description: Replacement of existing drinking water infrastructure and installation of a backup generator and backup well for the Burrel Elementary School

Sponsor / Proponent: Self-Help Enterprises

Section
 

Description: Extension of drinking water service near Reedly to provide safe drinking water for residents who rely on domestic wells.

Sponsor / Proponent: Self-Help Enterprises

Description: The replacement of approximately 18,300 feet of District potable water distribution pipelines in three of the District’s service areas, Summit Area, Lower Summit Area, and Texas Trail and a new potable water well.

Sponsor / Proponent: Self-Help Enterprises

Description: The project includes new waterlines and hydrants to communities in Wofford Heights.

Sponsor / Proponent: Self-Help Enterprises

Description: Improvements to the Lemon Cove Water System, including two production wells, water tanks, and other infrastructure.

Sponsor / Proponent: Self-Help Enterprises

Description: The project includes construction and operation of a water storage tank and other infrastructure and replacement of a distribution pipeline system for 43 connections in Plainview to protect the community from nitrate contamination and ensure adequate backup storage capacity.

Sponsor / Proponent: Self-Help Enterprises

Description: 7-mile, 48-inch pipeline connecting AVEK’s Westside Water Bank (150,000 AF capacity) to its southern service area, enabling delivery of stored SWP water to disadvantaged communities.

Sponsor / Proponent: State Water Project Contractors

Description: Raises 46 miles of concrete canal liner along critically subsided portions of the California Aqueduct to restore conveyance capacity.

Sponsor / Proponent: State Water Project Contractors

Description: Removes invasive Arundo donax from stream channels in Madera and Merced Counties to conserve water, improve habitat, and reduce flood/wildfire risk.

Sponsor / Proponent: River Partners

Description: 8.8 miles of pipeline serving 4,816 acres of irrigated agriculture, reducing groundwater reliance and benefiting nearby severely disadvantaged communities.

Sponsor / Proponent: Arvin-Edison Water Storage District

Description: About 1 mile of new canal and 21.1 miles of pipeline distributing surface water to 11,000+ acres of groundwater-reliant irrigated land.

Sponsor / Proponent: Arvin-Edison Water Storage District

Description: Pipeline network delivering surface water in-lieu of groundwater pumping near the City of Arvin, a severely disadvantaged community.

Sponsor / Proponent: Arvin-Edison Water Storage District

Description:  About 4,000 acres of multi-benefit floodplain restoration and acquisition near the Grasslands Wildlife Management Area, western Merced County.

Sponsor / Proponent: River Partners

Description: 825 acres of multi-benefit floodplain restoration on the Kern River, Poso Creek, and Tule Elk State Natural Reserve.

Sponsor / Proponent: River Partners

Description: About 990 acres of floodplain restoration/acquisition near the Crows Landing Bridge over the San Joaquin River, southern Stanislaus County.

Sponsor / Proponent: River Partners

Description: Regional water management effort expanding replenishment deliveries during above-normal and wet years to support groundwater sustainability and flood management.

Sponsor / Proponent: Turlock Subbasin

Description: Reclaims a 290-acre former mining site into a ~190-acre, 7,000 AF multi-benefit surface water storage facility on the Kaweah River system, with bidirectional pipeline, pump station, and riparian habitat restoration.

Sponsor / Proponent: Tulare Irrigation District